D LEVEL 751
It is a cement-based, self-leveling screed that can be applied between 5-50 mm in one
layer
Description
It is a cement-based, self-leveling screed
that can be applied between 5-50 mm in
one layer, contains hyper-plasticizing
chemical additives that provide easy
spreading.
DESCRIPTION:
It is a cement-based, self-leveling screed
that can be applied between 5-50 mm in
one layer, contains hyper-plasticizing
chemical additives that provide easy
spreading.
ADVANTAGES:
Easy and fast preparation.
Can be applied by mob or trowel.
Self levelling.
Suitable for floors exposed to medium and
intensive traffic.
It can be opened to traffic after 2 hours.
It became to scale by self levelling,
It is suitable for application in 5-50 mm
thickness without shrinkage cracks.
Resistant to abrasion.
Because of the private polymer, it has high
adhesion power.
USAGE AREAS:
Hospital, shopping malls. Schools, hotels,
Exposed to medium and intensive traffic,
before the last floor cover of the all
structure.
To create a solid and smooth surface
against wear and dust,
PVC, laminated flooring, wooden, carpet,
under the ceramic covers,
It is used after cement-based surfaces after
floor insulation.
( 23 °C Temparature and 50 % for relative
humidity)
Mix Density : 1,97 kg/dm3
Application Temperature : +5 – +30 °C
Compressive Strenght : ≥ 30 N / mm²
Bending Strenght 28 days : ≥ 5 N / mm²
Adherance : 1,70 N/mm²
***These values were obtained as a result
of laboratory tests, just contain finished
applications according to drying time
performance. Due to differences in
temperature and humidity values in the
construction site, the values may change.
Surface Preparation:
The surface; must be cured, dry and
durable. Loose surface mortar and such as
residues should be cleaned and reached
durable surface.
In case of the necessity the surface should
cleaned mechanically
Oil, grease, dirt, paint, salt and vomiting that
prevent adhesion should be removed.
If there are segregation, pits and fractures
on the surface, it should be repaired with
the repair mortar prepared by mixing with
DAYMAN PAIR PLUS and DAYMAN
LATEX C, the mixed mortar should be
applied at least 24 hour before.
Preparation Of The Mixture:
5,0-5,50 lit. liquid component is poured into
an empty and clean bucket.
Pour slowly 25 kg.powder into the water
bucket and use 400 rpm.mixer,
Do not add water after,
Rest 3-5 minutes to have the mortar.
Before starting the application mix 30
second again.
Application:
The surface to be applied must be primed
with DAYMAN LEVEL PR 617 as thinning
½.
There is risk of crack if primer is not done.
Pump casting is recommended in large
areas.
The prepared mortar is poured onto the
surface and the mortar is spread
automatically.
The thickness of the self-leveling mortar
should be adjusted with a steel trowel.
Level the surface with a spiked roller to
prevent air bubbles.
Can be walked on 6-8 hours after
application.
The application of second layer should be
done after 3 days..
It is recommended that the process be
completed within 15-20 minutes in order to
maximize the benefit of the product due to
its expansion.
The expired mortar should be disposed of.